Category:Environmental Assessment, GIS
This rationalization aims at modify the electric grid in the area, with the demolition, reconstruction and construction of about 180 km of electric lines, including 380 kV and 132 kV.
The assignment included the technical assistance, the preparation of the EIS, Appropriate Assessment, Landscape Assessment Report, Archeological Assessment, Geological Assessment.